تفاصيل التعبئة والتغليف
Packaging details of 80t Launching Gantry Crane:
1.Electrical parts are packed by strong plywood box, to prevent the rain soaked.
2.Main portal frame, jib frame and others are packed in plastic woven cloth, to prevent corrosion in seawater.